| |
 |
| |
|
|
|
1929 Hudson |
| |
 |
| |
Wood coach work being replaced. All wood had to be
custom fabricated.
We replaced the wood from the floors, roof rails and sail panels. |
| |
 |
| |
 |
| |
|
| |
Here the metal work and fabrication are completed
on the body, roof and cowl.
Now it's all being nailed to the coach. |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
previous
/ back to Restorations / thumbnails
/ next |